
3–8 Core Version 4.0.0 Altera Corporation
Cyclone II EP2C35 PCI Development Board Reference Manual May 2005
Configure the Board for Bench-Top Operation
Configure the
Board for
Bench-Top
Operation
The development board is initially configured for installation in a
conventional PCI slot. Five standoffs and five screws are included for
bench-top operation.
To configure the board for bench-top operation, follow these steps:
1. Position the board face up with the PCI bracket on the left.
2. Insert a screw in the hole next to PWR SWITCH (SW1) and fasten a
standoff to the screw.
3. Insert a screw in the hole next to RS-232 LEDs (D17 and D18) and
fasten a standoff to the screw.
4. Insert a screw in between J6 and J7 and fasten a standoff to the
screw.
5. Insert a screw in the hole next to external power jack (J2) and fasten
a standoff to the screw.
6. Insert a screw in the lower right corner next to J11 and fasten a
standoff to the screw.
To configure the board, perform the following steps:
1. Create a POF for your design.
2. Write the POF into flash memory.
3. Select the user-programmable EPCS64 device by setting the switch
(J3) to the Down position.
4. Force the device to reconfigure by pressing the RECONFIG
push-button (S2).
Comentarios a estos manuales